What it’s good for
- Larger site clearing and landscaping projects
- Bulk digging and levelling
- Excavating for building projects
- Loading and removing soil, rubble and green waste
- Bigger post holes with the auger attachment
Dirt removal
Digging turns up more spoil than most people expect. With the tipper truck on site, we load it and cart it off as we go. We’ll agree truck loads and any tip fees with you before we start.
Choosing a machine
Send us photos of the site and the way in. If the 800mm tight access digger would do the job better, we’ll say so.
We check for underground pipes and cables before every job. Before We Dig explains how, and what we’ll need from you.
Common Questions
By the hour meter on the digger, which only counts while the machine is running. The minimum charge is $100 to deliver the digger plus 2 hours of machine hire. Past those 2 hours, we charge the extra time in quarter-hour steps.
It needs a way in more than 1500mm wide and 2500mm high. That usually means driveway access. Text us a photo and we’ll confirm.
Ask us when you enquire and we’ll let you know what we can arrange for your job.